• Months
    Maximum period
  • AMD
    Maximum laon amount
  • People
    Got a loan

Renewable credit line - provided on terms and conditions stipulated in the table + 4% of the limit for operating limit + 4%.

Do not apply the tariff for the unused part of the loan for the upgraded credit line.

Payment types  declining (the principal amount equally), on the period of 2/3 of loan term: 2% of principal amonut
on the period of 2/3 of loan term, opportunity to re-acquire (recover) the outstanding amount
How to get a loan
  • Application
  • Preparation of documents
  • Loan confirmation
LOAN BENEFITS