- MonthsMaximum period
- AMDMaximum laon amount
- PeopleGot a loan
Renewable credit line - provided on terms and conditions stipulated in the table + 4% of the limit for operating limit + 4%. Do not apply the tariff for the unused part of the loan for the upgraded credit line. |
||||
Payment types | declining (the principal amount equally), on the period of 2/3 of loan term: 2% of principal amonut | |||
on the period of 2/3 of loan term, opportunity to re-acquire (recover) the outstanding amount |
How to get a loan
- Application
- Preparation of documents
- Loan confirmation
LOAN BENEFITS